I have run wires from my main box to the location where I wish to install my spa. I have 3 10 gauge wires (2 power, 1 common) all underground in conduit. Do I sink a rod in the ground for the ground or do I need to run another wire from the box? What are my options? I have also run wires to my shed, do I do the same here?