Originally Posted by dnau12
I want to ground my satellite dish and my phone line. (both installed by so called professionals and not properly grounded) Both enter the house 75 feet or so from where the main electrical enters the house. I want to drive grounding rods at each of the satellite and phone locations. I believe the rods all must be bonded together and also bonded to the main ground. My question is how long can the copper bond wire be that connects the rods? (is 75 to 100 feet OK) Also, in general, do I need just one rod at each location? Any help would be greatly appreciated.
Thanks,
Dennis