I am installing a new bathroom in our basement. The house is about 2 years old. The builder insists the rough-in is ready to go but I am not so sure. The attach pictures show the right and left sides of the room from the entrance perspective.
I will be placing a 72" shower pan with glass block on the left and a toilet and lav sink on the right.
The measurements for the right side shown in the pictures. I have to move the shower drain over a bit to accommodate the setup hence the cutout in the cement in pic 2.
I am concerned that the shower drain is about 7 feet from the vent on the lav sink. I thought this was outside the allowable code? My fix is to add a wet bar sink in the room behind and tie the shower drain and the sink into the existing vent (not seen in pic) that runs to the lav sink and I am assuming the toilet too.
Is this correct or have I been drinking too much while reading other posts?
I know I will have to dig out some cement to get the drain for the wet bar sink to line up but can I connect it to the same horizontal drain from the shower after the p-trap?
Thank you
Mark