I am in the process of installing a full bathroom in my basement. The basement is not roughed in so I have to break up the floor slab first. My question is about drain/venting. I have attached my floor plan, I need to know where I should place my vent? Or vents?
Can I place a single vent in back of my LAV in the stud wall that will serve as the vent for all three fixtures?
Thank you.