Basement Bathroom Rough-In
Good afternoon. I am overhauling my basement and I have removed a 10' x 10' section of slab in order to rough in the drainage for a new bathroom.
see layout: http://www.korteco.com/ben/floorplan.jpg
My first question is what size pipe (using PVC) should I use for my shower drain. I am using 4" for the stool, and 2" for the sink.
Also, Since my shower will be up against a stud-wall that is on the exterior basement wall, does that make it difficult to do all the copper pipework behind as you cannot access the back-side once the shower is in place?
Also, I will be transitioning from ~4" Cast Iron to 4" PVC on my main sewer line. Do you just use a rubber collar to make this, or is it best to use some reducers or other piece?
Oh you, one last Q... do you put a p-trap on any basment drain pipes?
Thanks,
Ben Horstmann
St. Louis, MO