I discovered about 5 homemade devices attached to a piece of equipment that use ground rather than neutral as their return path. The control circuit runs a couple of 120 V relays and valves. It switches 208V to a 1KW heater as well. The control circuit is not fused because the wire will melt first before the heater breaker will blow.
This is a safety hazard, but management in our department won't fix it because:
1) It's worked fine for 20+ years
2) I can't find a reference where it's bad
3) What can happen
Each piece of equipment is fed from a 50-60 AMP 4 wire service.
This same system may or may not shut down the heater if a phase is lost. You would lose about a week of time if it happened and everything was just right.
It's a large organization with a dept of occ health and safety and an electrical shop etc.
Any suggestions to get them to comply?