Finishing a basement project.
I am a new homeowner and the home I bought had a basement finishing job started I want to finish. The homeowner said he didn't have a permit and I think the wiring looks great (all 12-2 romex through metal studs with the wire protectors in place 20 amp breaker 20 amp outlets 18 inches off the floor outlets gfi at first outlet 9 outlets total a switch and 2 lights )but I'm not sure its to code. I am afraid if I get a permit they will tell me to rip it all out but at the same time I'm worried if I don't get one and something happens such as a fire that the insurance won't cover it. What would anyone suggest ?