Hey guys, I'm back. I have a quick question that I hope one of you can answer. I am trying to rebuild my deck. I have to redig footings for the beam since the previous owners did it incorrectly. I tried to dig the one on the end about a foot in but I got about a foot down and hit what seems to be a sewer pipe. I don't think it is because that would mean the sewer would run away from the street instead of to the street. Anyway, instead of finding out what this is, I was wondering what is the maximum distance from the edge of the beam to the first footing can I or should I go in? To clear this pipe I would like to go in about 1 1/2 to 2 feet in. The deck is 1 1/2 feet high and 12' wide (out from my house) x 22' long if this helps. Thanks for your help.