I am planning to tile the bathroom floor along with the walls and ceiling around the tub/shower.
I am using porcelain tile on the floor and ceiling and granite on the wall surrounding the tub/shower.
When mixing two different tile composites like this, is there anything in particular I need to consider when I lay down the tile?
Also, in what order should I lay the tile? Should I put the floor down first, the wall or the ceiling tiles?
Thanks, Brent
