I am installing a spa and will be running a 220v/50A circuit for its use. Before pouring a slab I would like to bury the conduit and stub it up at the appropriate location.
What type of conduit should I use? Is it best to use solid pipe which I would need a tube bender, or can I use PVC or flex?
Also, the existing wire run from the main panel to the junction box near the spa location has 8 gauge wire (black, red and white) but does not contain a ground. Is a ground required for the GFCI breaker I am required to use and if so, what is the best way to get it? Should I install a grounding rod before I pour the slab?