I am installing ceramic tile in a new bathroom in the basement and the plumbing has been roughed in, there is a 4"PVc pipe sticking out of the cement with no styfofoam liner around the outside of the pipe. I so I know I have to get an inside flange. My question is ; Do I install the tile first ; and glue the flange onto the tile , or do I glue the flange to the cement first then install the tile around it?
Thanks in Advance