Drain / venting questions for bathroom remodel
Is this OK?
Two story house with full basement. Remodeling master bath on second floor. Need to run new toilet drain, shower drain and drains for two sinks.
While ripping out the sheetrock in the area I discovered a 2" vent coming up from the half-bath and laudry room on the first floor. I opened up the top plate next to the vent and found the 2" vent connects to a three inch tee to service the washing machine and directly below that another tee to service the half-bath sink. In the basement that 3" line joins the main line exiting the house.
I want to open the wall next to the washing machine and cut out the tee that reduces to 2" and replace it to continue the 3" line to the second floor. There I will add a 90 degree bend with a 2" connection on the side to re connect the vent portion.
The three inch section will head to the toilet. Halfway to the toilet I'll add a tee to service a 2" line to go to the shower. I will also add a vent on this 2" line.
The old vent line will become a wet vent to service two sinks.
Is there anything a computer engineer who is not a plumber missed so that this is not a workable solution?
Thanks!