The 2004 Florida building code requires any pipe passing through a foundation or under a footer to be sleeved by a pipe 2 pipe sizes larger or install a relieving arch. I'm installing a 3" pvc dwv under my footer fully surrounded with soil through a 4" thin-walled sewer drain pipe that will pass as my sleeve. Question is : How do I create the waterproof seal that is required between the drain and sleeve? Thanks for sharing your knowledge...