What is the optimum size of teams to be employed during water-fall life-cycle stages.
Please advise for any aretical , web-site link or other source of material related to the above topic.any opinion will be very much appreciated.
What is the optimum size of teams to be employed during water-fall life-cycle stages.
Please advise for any aretical , web-site link or other source of material related to the above topic.any opinion will be very much appreciated.
Beyond my knowledge I'm afraid,but try http://www.business-esolutions.com/islm.htm to see if that web site is what you mean.
All the best,
Nez :confused:
[B]because this topic is my current term paper in information system engineering course (within CBIS master programme), I have collected a lot of researches that talks about optimum team size but most of them in testing stage.
However below some of these researches:
http://www.stsc.hill.af.mil/crosstal...0/xt96d10e.asp
www.software-metrics.org/documents/1081.pdf
www.qsm.com/process_01.html
http://floss.syr.edu/StudyP/ecis2003.pdf
Please if you have also any sites or researches send them to me.
Best Regards
Waheed
[email protected]
All times are GMT -7. The time now is 07:59 AM. |