Originally Posted by massplumber2008
Hey Brian...
Again, all looks great!!
First, I want you to cap a piece of 3" pipe that is six inches long and then cap it with a jim cap. Then I want you to dry fit this into the toilet elbow. You need to dry fit (just place into toilet hub) this because you will be pulling it out later and using a STREET closet flange after tile is installed to install the toilet. Wrap cardboard around the hub and the pipe so that concrete won't touch it when patching floor.
Second, cement 15" pipes into the shower ptrap and the sink drain and then cap them with jim caps.
Third, you want to build a box out of 2"x4" so that box is about 8"x8"....build it with only 1 nail in each end as this will be installed around the shower pipe so that it is about an inch above the concrete floor and then you will install the concrete floor and then you will pull the 2"x4" box out later so that you can install the shower strainer assembly for your new GRAVITY FLOW shower...;)
Let me know what you think or if have more questions!
MARK
.