I thought I was out of the woods for a minute.
I wanted to add a few things to help clear things up.
I tried to used 45s but the copper pipes were in the way of that angle.
The foundation wall is poured, not block.
There are copper lines and a gas pipe in between the trap and the wall.
There is also electrical lines that set on top of the wall that you can't see in the picture.
After massplumber said it looked like a good job, I glued everything together -oops.
Here is another picture from the bottom to show the pipes:
IMG_20100826_122048 | Flickr - Photo Sharing!
http://farm5.static.flickr.com/4096/...6bb4261a_z.jpg