Recalcuate the projected manufactoring costs for job no 110 using three separate rates: one rate or plantwide overhead. Two separate department overhead rates all based on machine hours.
Plantwide overhead=800,000. Expected Machine hours- Dept. A: 10,000 Dept. B: 50,000. Actual Activity Dept. A: 10500, Dept. B: 52000. Machine-hours projected Dept. A 100, Dept.B 1200