Running two 100 amp main panels from a 200 amp service
Greetings!
I live in a rural country area. The electric company will be installing a pole, meter, and 200amp service with disconnect at pole. (It will require 50 foot run of service cable from pole to main load center in mobile).
Currently the double wide has a General Electric 100amp Main Load Center. This is not going to be enough as I plan on changing the gas hotwater heater, the gas cook stove and the gas central heating unit all to electric. There is no more room in the existing load center.
I have another G.E. 100amp main load center. What I want to do if possible is to install a trough and use split bolt connectors and run service wires to each of the main load center thus giving me 200 amps total. I realize I will have use torque according to mfg specs and use an oxidant.
My twofold question is:
- the SER cable will be rated for 200amp, but when I run feeders from the split bolt connectors can i go down to wire rated for 100amp?
- Since this will not be a "main" panel / "sub" panel set up, there is no reason to have one box with neutral isolated, it can be bonded - correct?
If I am incorrect, please advise the best possible solution to get 200amp service out of 2 100amp load centers.