txman1
Dec 13, 2008, 08:56 AM
I plan on ripping out the old tub in a mobile home, and installing a walk in shower. What is the correct sequence of steps required to build up the base, slope the thinset or cement, and install the membrane.  Is there a video available.  I plan on ceramic tiling the stall once it is ready.