What is the best way to air pressure test a new pvc waste/vent line?
The plumbing inspector wants it air tested @ 5 psi for 15 minutes. This is the rough plumbing for a second floor addition, so I've glued all the pvc, but have not glued the connections to the main soil stack or to the main vent stack.
Can I simply cover all the open connections with fernco quickcaps and use one opening for the gauge and air injection? For the gauge fitting, can I just concoct something temporarily that will go from 1 1/2" (for the sink) to a 1/2" thread so I can connect my gauage (which also has an air inlet and stop valve)?
The gauge I have is 0-100 psi, so that probably isn't accurate enough for 5 psi is it?
Is there more to this?