I am adding a bathroom in abasement that is stubbed in. My questions are;
1. Do I simply remove the plastic pipe that is now covering the waste line for the toilet and glue a toilet flange to the pipe where it enters the concrete floor? 2. Same general question on the drain line for the vanity? What is the process to connecting the p-trap to the hole in the floor for the vanity drain? Thanks for your help.