Estimate time to installed shut off valves
I have a couple shut off valves I want to replaced since they are aged and it's gate valve. I want to replace them to brass ball valve.
1" Main shut valve + 1" PRV straight inline installation, space is good. Estimated 2 hours
Laundry (hot and cold) shut off 0.5" and backyard hose shut off 0.5". They are near to each other. One might be a little tight on space. Estimated 3 hours total max
Am I about right on the labor time? I want to check if I am getting kill on quotes