Tile Re-Work in Tub/Shower Area
I had my tub taken out and a new tub installed by a plumber and tile put in by a tile person. The job has not gone well (the tub was damaged & the damage covered up and the tile person put two different shades of white tile in the tub area.
The plumber is going to replace the tub (has several dings and has never been used).
The tile company will be removing approximately 60 off color tiles ( 6" x 6", Daltile) and will also have to remove two rows of tile at the edge of the tub. The tile person is going to try and do this without taking all the tile out.
1. What are the chances if all the tile is not removed that they will be able to match the tile not removed (approximately half of the tile has to be replaced along with the trim).
The original tile work was completed 1/11/08 and this rework is being done under a "guarantee" after several weeks of pursuing a resolution to the unacceptable work.
2. Why is the grout starting to crack and do I need to be concerned?? The tub area does not have water hooked up to it and has not been used since this work originally started (12/2007). Just after the work was done there were not cracks. The cracks are just now starting to appear and at this time are in the two back corners.
Any information will be helpful. Thanks.