Does load center need to meet new code if only replacing meter socket?
My outside power box with standard circuit breakers is inside the same box as my meter socket above it. But you don't need to remove the panel cover for the breakers to service the meter socket. So if a new meter socket for a digital meter (which the power company is forcing me to get) is sized for the old box, then should I need to replace the load center since the old breakers don't meet current NEC code (but wouldn't be touched)? And how likely is replacing a 1970 meter socket going to require more space (larger box) for new meter socket (i.e. is there some kind of "more space for wiring" when it comes to replacing a meter socket like there is for replacing a load center)?