Not your question?
Ask your question
View similar questions
Add your answer here.Check out some similar questions!
Basement Bathroom Construction Question...
[ 3 Answers ]
Can you install the plumbing fixtures (toilet, sink, shower) to a basement bathroom first and then install the walls and lineolum flooring a few years later for time and money purposes? What are the pros and cons to doing in this way and will this cause more work in the long run?
New Construction-the plumber forgot to vent the basement bathroom!
[ 4 Answers ]
I'm building a new house with a walkout basement with a bathroom (toilet, shower and sink) and a 1 1/2" vent was roughed into the floor but the plumber forgot to bring it up to the roof to vent it. He is now going to install a Oatey 6 DFU Sure Vent in the 1 1/2' vent pipe 1' above the floor. He...
Building a covered deck above a covered front porch
[ 2 Answers ]
We are trying to improve the curb appeal and usefulness of our hangar home. We are planning to have a deck built above the covered front porch, and will replace the double windows (the set on the left on the 2nd floor in the front view) with French doors. Because this faces south and we are in...
What's the order of construction in my finished basement?
[ 6 Answers ]
I've got drywall up and am in process of painting now. I still have to install doors, cabinets/vanity, toilets, flooring and trim. Do I install the flooring before the doors, cabinets, toilet, etc? Any particular reason to do one beforenthe other?
Ranch home construction q*estion - drill ext wall to basement
[ 10 Answers ]
Home built in the 60's, exterior brick, block basement. Walls uninsulated. What will I hit if I attempt to install a low voltage box in an exterior wall and drill through the bottom 2 x 4 (I would assume). 1) Will I hit basement? 2) Will I hit somewhere in the top of a block in the... View more questions Search
|