How do you splice the main cables feeding you circuit panel?
[ 2 Answers ]
I want to move my main panel from one room to another, but how do you splice the main cable coming from the meter to my new panel location?
Ampacity of adjacent buried cables
[ 6 Answers ]
How do I determine the ampacity of two aluminum 3-conductor cables with ground , rated 0 to 600 volts buried in PVC conduit 24 inches below the surface and adjacent to each other?
NEC/NESC requirements for direct buried cables on the DC side
[ 7 Answers ]
Does anyone know any where I can find texts/paragraphs covering the requirements in terms of burial depths, voltage, etc for underground cables on the DC side. I looked at section 35 of the NESC Code 2007 Handbook as well as the section 300.5 of the NEC 2008 handbook. However, I believe those only...
NEC/NESC requirements for direct buried cables on the DC side
[ 2 Answers ]
Does anyone know any where I can find texts/paragraphs covering the requirements in terms of burial depths, voltage, etc for underground cables on the DC side. I looked at section 35 of the NESC Code 2007 Handbook as well as the section 300.5 of the NEC 2008 handbook. However, I believe those only... View more questions Search
|