Ask Experts Questions for FREE Help !
Ask
    redjames's Avatar
    redjames Posts: 7, Reputation: 1
    New Member
     
    #1

    Mar 31, 2008, 03:48 PM
    Lead toilet flange
    I removed my old toilet to replace it and the old flange was a brass ring and a lead flange bent over the ring the lead flange is connected to a copper waste line. I straightened the lead out carefully and removed the brass ring and replaced some of the floor. Now I want to put a new flange in. Can I use a "Twist and Set" PVC Toilet Flange inserted inside the existing lead/copper pipe? Or should I put the brass ring back and bend the lead over the brass ring again? The finished height of the flange would be about 1/2 inch below the finished floor if I did this. Using a "Twist and Set" I could get the flange level with the existing floor.
    razor96's Avatar
    razor96 Posts: 87, Reputation: 8
    Junior Member
     
    #2

    Mar 31, 2008, 04:01 PM
    Use flange extensions the flange must be at or slightly above floor level. They are available from about 1/8" to 5/8".
    massplumber2008's Avatar
    massplumber2008 Posts: 12,832, Reputation: 1212
    Senior Plumbing Expert
     
    #3

    Mar 31, 2008, 04:43 PM
    Hi guys:

    A toilet flange wants to sit on top of the finished floor.. but that may not happen here.

    That twist and set flange could be a good idea... or a bad idea. All depends on the "feel" as you set/twist it in. I will say that if fails, then will eventually show up at downstairs ceiling... sometime... ;) But may work... should explore a bit for sure.

    If I were you I would explore the twist and set... and then I would put that brass flange back and then peen (bend) the lead back over as it was. If any tears result then may need to rough surface of lead with sandpaper and use an epoxy putty to seal cracks at edge (see pic. #1). If that works... then may not need the twist & set flange.

    Then install extension flange(s) as Razor96 suggested (see pic.#2 and "attached image"). Secure these properly and makes pretty good seal! In this situation I would bring flange level with finished floor and then set the toilet bowl with an EXTRA THICK WAX GASKET and extended johhny bolts (available at all home supply stores). Extensions are great, but thick wax gasket never fails!

    My absolute best advice... open the ceiling, cut lead out back to copper pipe and install a shielded coupling (pic. #3) to transition from copper to PVC pipe/fittings and new closet flange and be done with lead once and for all!!

    Let us know your thoughts... Mark

    .
    Attached Images
       
    Attached Images
  1. File Type: pdf closetflange2.pdf (96.1 KB, 268 views)
  2. razor96's Avatar
    razor96 Posts: 87, Reputation: 8
    Junior Member
     
    #4

    Mar 31, 2008, 04:54 PM
    I wish I had those pictures to show. Sounds good mass. Touché
    massplumber2008's Avatar
    massplumber2008 Posts: 12,832, Reputation: 1212
    Senior Plumbing Expert
     
    #5

    Mar 31, 2008, 04:56 PM
    Razor... contact me via PM and I can explain how you can have them, too. Anytime... Mark
    redjames's Avatar
    redjames Posts: 7, Reputation: 1
    New Member
     
    #6

    Apr 1, 2008, 01:23 PM
    Thanks for the advice. Unfortunately this is a concrete floor or I would have replaced it with ABS. I will try a "twist and set" flange and see how it feels and looks. If that does not work I will do what you suggested and reset the brass flange and use the extensions to bring it level or above the finished floor height and then use an extra thick wax gasket.
    Thanks for your advice and pictures. I will let you know how it goes.

    On another note I need to tap into my 4" copper stack and put in a Wye to attach a drain for my laundry machine which is right beside the stack. I guess I could use a sheilded coupler on either site of the ABS Wye. Does this sound good? How do they hold up to the vertical weight of the stack?
    Thanks in advance.
    Steve
    razor96's Avatar
    razor96 Posts: 87, Reputation: 8
    Junior Member
     
    #7

    Apr 1, 2008, 02:46 PM
    They are excellent items, just be patient with them. Although I would prefer that you remove the copper drain completley and replace with abs. That is code in our area when you renovate, but then again I am in canada. Good luck to you.
    razor96's Avatar
    razor96 Posts: 87, Reputation: 8
    Junior Member
     
    #8

    Apr 1, 2008, 02:47 PM
    Sorry, to answer your other question, the stack should be supported already with straps or whatever to keep the weight off all other connections.
    massplumber2008's Avatar
    massplumber2008 Posts: 12,832, Reputation: 1212
    Senior Plumbing Expert
     
    #9

    Apr 1, 2008, 03:29 PM
    Hi Guys:

    Sounds like you're moving ahead, Steve. Some more information for you.

    When cut into that stack... be careful... like Razor said, it should be hung... but that doesn't mean much in the long run... you never know who did the work? I would support the copper stack from underneath with a couple 2"x4" studs under a branch fitting from above where you make your cuts... JUST TO BE ON SAFE SIDE.

    Then... shielded couplings should be just fine.. they do great with weight of stack so no worries there.

    For washing machine you want a 2" drain, 2" p-trap and an 1.5" vent. You must have a vent off the drain line for washing machine or trap will get siphoned when toilet or tub drains from upstairs. You may be able to use an AAV (air admittance valve for vent.. see pic.) as vent, but need to check and see if allowed by code in your area. This AAV connects just after trap (see pic.#2). The pic. Is for sink... but shows where AAV goes in relation to ptrap... you get the idea. I would stub higher than pic. Shows... say 10-12 " above the trap.

    If allowed then super easy to install these. If not allowed then need to run an 1.5 inch vent to another vent from the basement or may even need to run upstairs to attic and connect into vent there (I would just add the AAV..but I did not say that..ok?? ;) )

    The standpipe for washing machine should be between 24" and 36"...I go about 30" standpipe... full size 2".

    Hopefully that gets you rolling at washing machine. Get back to us with any questions... glad to help... Mark

    .
    Attached Images
      

Not your question? Ask your question View similar questions

 

Question Tools Search this Question
Search this Question:

Advanced Search

Add your answer here.


Check out some similar questions!

Leaky Riser / Lead Flange ? [ 2 Answers ]

Plumbers have isolated a minor leak beneath our toilet, evidently where the PVC riser and "lead flange" are joined (somewhere near base of slab ~6" below grade?). They propose tunneling and repairing from below slab at huge expense. Trying to understand the nature of this leak, what caused...

Lead Bend Toilet Flange [ 4 Answers ]

I think I have a real problem. In a bathroom remodel the plumbers left a 4" lead bend with about 6 inches above the new floor height. The tiling contractor cut the lead bend even with the floor, (about 1/4 inch above the tile). I gather from other wuestions that I don't have enough lead pipe to...

1930 toilet flange / lead pipe problem [ 2 Answers ]

I have a home that was built in the 1930s. I have a problem with the toilet on my first floor. When the water supply to the toilet is on water leaks through the floor to the basement below. Here are some random facts: The floor in the bathroom is original tile. The floor doesn't appear to be...

Replacing a toilet flange with a lead connection [ 6 Answers ]

I am about to pull up my old toilet and take a close look at what's underneath. I am also going to go over the original plank sub-floor with fresh 3/8" ply (followed later with thin lauan for eventual linoleum) there is a visible floor patch from an old repair. Given the fact that there has been a...


View more questions Search