    Basement rough
    Hi there I have a question about 2 4" pipes coming out of basement slab... one is raised and on is flush... both ate capped and connect directly to street... I'm prettty sure raised one is clanot but not sure about other... both emmit strong gas when caps removed?
    RickJ's Avatar
    RickJ Posts: 7,762, Reputation: 864
    Uber Member
     
    #2

    Feb 3, 2006, 05:32 AM
    Yes, one should be cleanout and the other toilet.
    kelly1795's Avatar
    kelly1795 Posts: 6, Reputation: 1
    New Member
     
    #3

    Feb 3, 2006, 05:36 AM
    Wow thanks for the quick answer... I'm sure this is a dumb question but are there any options to add a sink and toilet to this scenario without breaking slab
    RickJ's Avatar
    RickJ Posts: 7,762, Reputation: 864
    Uber Member
     
    #4

    Feb 3, 2006, 05:41 AM
    I'd think that with a toilet drain roughed in you should also have a 1 1/2" or 1 1/4" drain for the sink coming out of the wall near it. Do you see anything like that?

    And of course for both, you need supply lines, which won't involve busting up concrete.
    kelly1795's Avatar
    kelly1795 Posts: 6, Reputation: 1
    New Member
     
    #5

    Feb 3, 2006, 05:46 AM
    No nothing else there 100 year old house but newer slab... I ran supply lines when I finished basement just wondering what my options were for that room... wasted space right now and no bathroom in basement... room is at front near street actually under front porch so no venting either
    RickJ's Avatar
    RickJ Posts: 7,762, Reputation: 864
    Uber Member
     
    #6

    Feb 3, 2006, 05:49 AM
    Adding drain lines for a sink will be tricky at best and require busting up concrete at worst. Speedball, or resident plumbing expert, out of be along soon; we can both learn something when he "pipes in" :p .
    kelly1795's Avatar
    kelly1795 Posts: 6, Reputation: 1
    New Member
     
    #7

    Feb 3, 2006, 05:51 AM
    Well thanks very much for your replies
    speedball1's Avatar
    speedball1 Posts: 29,301, Reputation: 1939
    Eternal Plumber
     
    #8

    Feb 3, 2006, 05:51 AM
    Quote Originally Posted by kelly1795
    Wow thanks for the quick answer ....I'm sure this is a dumb question but are there any options to add a sink and toilet to this scenario without breaking slab
    Hi Kelly,

    You're already roughed in for a toilet and unless there's a underslab rough in for a sink and vent you will have to break cement to connect to the main. You do realize that you'll have to vent the toilet don't you? Look around for the pipe sticking out of the wall as Rick suggested. If there is one then the sink and the vent connection for both sink and toilet's already there.
    Good luck, Tom
    kelly1795's Avatar
    kelly1795 Posts: 6, Reputation: 1
    New Member
     
    #9

    Feb 3, 2006, 05:55 AM
    No other pipes there that's why I couldn't figure out why the two 4" pipes in the floor don't understand what they were thinking of doing in there?
    speedball1's Avatar
    speedball1 Posts: 29,301, Reputation: 1939
    Eternal Plumber
     
    #10

    Feb 3, 2006, 06:21 AM
    OK Kelly,

    If you're serious about adding a sink and a toilet to your basement let's look at the way you can do it without tearing up your basement floor. First I need to know how far the 4" pipes set off the front wall. The one closest to a foot off the wall will be for the toilet, where is the other one located? That's the one I would attach a wye on and make the branch a cleanout and reduce the top end down to 2" to pick up the sink. You realize that doing it this way will expose the drain line from the sink don't you? Having pointed that out you can come off the top of the tee with a 2" DWV street ell and arm over to a 2" tee on it's back. From the branch of the tee you will install a AAV cheater vent and from the end a 2 X 1 1/2" elbo and 1 1/2" stubout toi pick up the sink. You may now place a flange for the toilet and complete your addition. Good luck, Tom
    kelly1795's Avatar
    kelly1795 Posts: 6, Reputation: 1
    New Member
     
    #11

    Feb 3, 2006, 06:28 AM
    Thanks for the quick reply wow very inpressed with this board... the cleanout is about 10 to 12 inches further in from toilet pipe... unfortunately right in middle of room... maybe best thing to do is break floor and do it right I guess I'm lucky the sewer drain is right there so it won't be a huge job?
    speedball1's Avatar
    speedball1 Posts: 29,301, Reputation: 1939
    Eternal Plumber
     
    #12

    Feb 3, 2006, 06:35 AM
    Quote Originally Posted by kelly1795
    Thanks for the quick reply wow very inpressed with this board.....the cleanout is about 10 to 12 inches futher in from toilet pipe....unfortunately right in middle of room.....maybe best thing to do is break floor and do it right i guess im lucky the sewer drain is right there so it wont be a huge job?
    There is another option open to you besides breaking up the floor. You could put down walls. Even make a double wall to hide the pipes from the sink. Since I don't know where the pipes are located in relationship to a outside wall I can't advise you on the feasibility of building a room. Cheers, tom

Not your question? Ask your question View similar questions

 

Question Tools Search this Question
Search this Question:

Advanced Search

Add your answer here.


Check out some similar questions!

Basement rough in [ 5 Answers ]

I would like to rough in plumbing in my basement for a full bath (toilet, sink, and shower). I live just outside of Chicago so I suspect the plumbing codes are the same as Chicago. Currently in my basement I have two sump pumps and pits, one pump takes care of the drainage around the foundation...

Basement rough in? [ 4 Answers ]

Hello, I just bought a house with a 3 piece rough-in in the basement. I am building a bathroom and as I prepare to do the framing work, I am wondering how much room do I leave from the rough-in toilet drain to the drywall? Any help would be appreciated. Thanks, Mike

Basement Rough-ins [ 3 Answers ]

I have a house that is 14 years old and it has rough in plumbing in the basement. One for the toilet and one for the shower. Also a stand pipe next to a wall which I assume is the vent. Does the rough in plumbing have the traps below the concrete flooring?

Basement rough-in [ 3 Answers ]

I've seen a few of the posts w/ similar topics, and I think I'm on the right track. Just looking for confirmation from some experts. The center of the tub rough in drain is about 15.5" from the wall I'm puttting in and about 2" from the back wall I'm set to screw down. Question is, will a std....

Basement rough-in: dap out [ 12 Answers ]

Hello, I've spent the last 3 hours trying to figure out if my roughed in bath is missing something or not and wondering if I am going to have to redo any of my framing. I have the 4" and 2" drains in the toilet area and a 12"x12" dap out for the tub. Well I took the cover off the dap out to take...


View more questions Search