Not your question?
Ask your question
View similar questions
Add your answer here.Check out some similar questions!
Dmz area
[ 7 Answers ]
What is OWA means? OWA "front End" " DMZ Area"? OWA "Back End" " DMZ Area"?
Remodeling a remodel
[ 3 Answers ]
A ceiling light was removed during a previous remodel and power was directed to supply a ceiling fan with a light kit installed. The ceiling fan was subsequently replaced with another unit (also with a light kit installed.) At the old box there is currently no light fixture. Just a bundle of...
Concerns with circuit overload because of bathroom remodeling
[ 1 Answers ]
I’m in the process of remodeling my basement bathroom and have hit a road-block with the wiring. Here are my questions. • Before I started my basement bathroom remodel, the only thing that was wired in the bathroom was a vanity light from a 15A circuit. This circuit is shared with the upstairs...
Remodeling Bathroom, Need to move drains/vents
[ 7 Answers ]
I am in the process of remodeling my bathroom. I am moving all fixtures, toilet, sinks, shower, and jaccuzi. It is on a concrete slab, which I have mostly tore up. I am looking for some help with vents and drains for my new project. I attached a PDF with my proposed fixture layout. I...
Remodeling a Shower Stall
[ 1 Answers ]
If I purchase an acrylic shower base is it necessary to install some sort of moisture barrier between the cement board and the base? Thanks, Mike R View more questions Search
|