Type: Posts; User: emmiibemmii
TYPO ** sorry
Pegs are to be positioned in a trench at 5m intervals at a gradient of 1 in 50 rise, starting at a height of 18.20m ODm, for the first peg. A level was set up and a BS of 2.56m was obtained on a TBM...