Adhesive? New ceramic tile install - one inch hex shape sheets
[ 5 Answers ]
Hello I am putting in a brand new full bath where there had been just a half bath.. I am done the roughing in and the framing, cementboard, sheetrock, etc. - and I have a question about the tile installation. For the floor, I chose an older style of tile that is the white octagon/hexagon...
Install 3 inch toilet drain in concrete slab
[ 1 Answers ]
I want to add a new toilet to the laundry room in our garage which is located on a concrete slab. The plumbing is already installed for a laundry sink and a washer. This will require adding a 3 inch pvc drain for a toilet that will have to be installed through the concrete slab which will be inches...
5 inch wide pine flooring install and moisture content
[ 2 Answers ]
Hello I bought 600 square feet of 5 inch wide pine flooring for my third floor - guest room and small office space. The rooms are currently old tongue & groove over joists subflooring with no finished floor ever installed since 1920. I was going to install the new pine running perpendicular to...
Moving a toilet over an inch.
[ 6 Answers ]
I have to move my toilet over an inch away from the wall per inspector's order. The top of the main sewer line is 4" below ground level encased in the concrete foundation with a 4" 90 degree street ell (spg x hub) at the end. The end of the elbow is .5" below ground level. I found an abs offset...
Moving a toilet over an inch above an already finished floor
[ 1 Answers ]