Not your question?
Ask your question
View similar questions
Add your answer here.Check out some similar questions!
Shower on cement floor
[ 5 Answers ]
I want to add a shower to our basement, the plumbing is not there. How do I put the shower plumbing in? Do I have to cut into the main pipe for the shower? Do I have to cut into the cement, or can the plumbing be installed above the cement? Thanks
Oil Spill on cement
[ 4 Answers ]
How do I clean up an oil spill on the driving pad at my condo.
Painting on a cement wall
[ 1 Answers ]
I'm an artist with a job to do a painting on an exterior cement wall and I want to make sure I use the right paint. It was previously painted and is in decent shape. I could use cement paint, but it doesn't come in all the colors I need. Can I use cement paint for the first coat, and then...
Contact cement won't adhere
[ 4 Answers ]
I built a kitchen countertop about a month ago and had no problem whatsoever with the contact cement/laminate procedure. I decided to build a matching island/peninsula and am now finding that the contact cement will not adhere at all. I've followed the recommended times for drying but it just...
Grout vs cement
[ 1 Answers ]
Hi, I'm tiling the floor of my front entryway/vestibule, and in the lay-out I have designed, have a 2" tile border with a 1/2 inch space on either side running around the perimeter of the 4' square space (larger 6" tiles are fill the centre of the space with 1/4" spacers). I wanted to know... View more questions Search
|