Not your question?
Ask your question
View similar questions
Add your answer here.Check out some similar questions!
Going to finish my basement...
[ 7 Answers ]
hello. I'm starting the infamous "basement project". For starters, the floor is not level. The house if about 45+/- years old. It's not on a huge or uncomfortable pitch, but the floor leans slightly to the floor drain. What I'm wondering really is where the 3 floor support posts are under...
Basement Finish
[ 2 Answers ]
I am in the process of finishing my basement, about 800 sq ft consisting of a bedroom, bathroom, and rec room. There are three existing heating vents, one in the bedroom and two in the rec room. I am thinking of adding a vent in the bathroom and another in the rec room near a window. This is...
Metal Basement Duct work change out for PVC
[ 5 Answers ]
I have a rectuangular suppluy and return system that feed from from furnace at one end of my basement. It has two main leads out. They branch off and finally reduct to a single duct at the far end of my house. I'm looking to put in a drop celling and would love to swap out my existing duct work...
Basement finish
[ 1 Answers ]
Does a 20 amp breaker require 12/2 wiring? Also, is there a standard number of outlets and lights (2x2 flourescents) that are standard on a 15 amp breaker (code states 2,880 watts maximum, but I don't know how many outlets this equals).
Replacing trim
[ 1 Answers ]
I am in the process of replacing some of the wood trim in my home. Some areas on the sheet rock does not have 2x4 reinforcement to nail to. How would you suggest I install the trim with? It seems that when I use the trim nails they will not hold the wood flush against the sheetrock. View more questions Search
|