    Timing for finish work (flooring, trim) in basement
    I have a contractor who is doing the majority of the work in finishing my basement. As we get closer to being done (they are currently hanging the drywall), I am trying to get a feel as the best way to time/stage the final things.

    In order to save some money, I am going to be installing the flooring myself -- a 5/16" floating engineered wood floor. This will be my first time doing that, so I am trying to make sure I give myself enough time, without any pressure, to do the best job possible.

    My initial thoughts where to have him finish everything, including the base moulding. Once he was done, I would go in and do the wood floor, and then the shoe moulding. Based on that, I was planning on having him hang the basemoulding 5/8" off the floor to allow easier install of the floor.

    I am wondering if that is going to make it more difficult for me to install the floor because I won't be able to use the drywall to place spacers against -- I will have to use the base moulding instead.

    Or, should I do the flooring first and then have him do the trim work (does that include door casing as well?). If I do that, how do I ensure that the floor does not get damaged in the process (paint, scrapes, etc).

    In general, I am open to suggestion on how best to stage these final steps.
    shygrneyzs's Avatar
    shygrneyzs Posts: 5,017, Reputation: 936
    Uber Member
     
    #2

    Dec 10, 2006, 09:56 AM
    I only have a couple questions - if you do this finish work by yourself and somehow damage the work the contractor already did - are you out of any guarantee of the work already done? Does the contractor have to stand by his previous work? I would think not.

    Also, since this is your first time doing this, do you have someone helping you who has done this before, so you can avoid the beginner errors?
    aclute's Avatar
    aclute Posts: 9, Reputation: 1
    New Member
     
    #3

    Dec 10, 2006, 10:11 AM
    I don't know the answer to the first question -- good one though.

    As for the second one, I am do have a professional wood installer coming by to have help me with the first couple of rows to get me started.
    shygrneyzs's Avatar
    shygrneyzs Posts: 5,017, Reputation: 936
    Uber Member
     
    #4

    Dec 10, 2006, 08:44 PM
    Good luck to you! It sounds like you are doing the smart thing by having a professional come in and show you how to get started. Hope it all turns out well.

Not your question? Ask your question View similar questions

 

Question Tools Search this Question
Search this Question:

Advanced Search

Add your answer here.


Check out some similar questions!

Going to finish my basement... [ 7 Answers ]

hello. I'm starting the infamous "basement project". For starters, the floor is not level. The house if about 45+/- years old. It's not on a huge or uncomfortable pitch, but the floor leans slightly to the floor drain. What I'm wondering really is where the 3 floor support posts are under...

Basement Finish [ 2 Answers ]

I am in the process of finishing my basement, about 800 sq ft consisting of a bedroom, bathroom, and rec room. There are three existing heating vents, one in the bedroom and two in the rec room. I am thinking of adding a vent in the bathroom and another in the rec room near a window. This is...

Metal Basement Duct work change out for PVC [ 5 Answers ]

I have a rectuangular suppluy and return system that feed from from furnace at one end of my basement. It has two main leads out. They branch off and finally reduct to a single duct at the far end of my house. I'm looking to put in a drop celling and would love to swap out my existing duct work...

Basement finish [ 1 Answers ]

Does a 20 amp breaker require 12/2 wiring? Also, is there a standard number of outlets and lights (2x2 flourescents) that are standard on a 15 amp breaker (code states 2,880 watts maximum, but I don't know how many outlets this equals).

Replacing trim [ 1 Answers ]

I am in the process of replacing some of the wood trim in my home. Some areas on the sheet rock does not have 2x4 reinforcement to nail to. How would you suggest I install the trim with? It seems that when I use the trim nails they will not hold the wood flush against the sheetrock.


View more questions Search