    frazwood's Avatar
    frazwood Posts: 129, Reputation: 2
    Junior Member
     
    #1

    Jul 21, 2009, 07:37 AM
    Upgrading 50-amp service
    My wife and I are considering purchasing a house... to give you a little bit of background, the description of it says "needs a lot of TLC", which I have confirmed to be true.

    One issue with the house is the electrical service. It appears to have only 50-amp service. It's not a particularly large house (1000 sq ft). How difficult would it be to upgrade to 100 amp service?
    tkrussell's Avatar
    tkrussell Posts: 9,659, Reputation: 725
    Uber Member
     
    #2

    Jul 21, 2009, 07:52 AM
    Not very difficult at all, for an electrician that has done these before, should take about 4 - 6 hours. plus a couple of hours before for mobilization and permitting.

    If someone never did a service change, it could take 2-3 days just to do the work, not including the time it takes getting all the materials, of which there are several choices, getting permit from the local inspector, consulting with the power utility for types of meters allowed, confirming serivce location, and submitting load calculations.
    frazwood's Avatar
    frazwood Posts: 129, Reputation: 2
    Junior Member
     
    #3

    Jul 21, 2009, 10:49 AM
    Quote Originally Posted by tkrussell View Post
    If someone never did a service change, it could take 2-3 days just to do the work, not including the time it takes getting all the materials, of which there are several choices, getting permit from the local inspector, consulting with the power utility for types of meters allowed, confirming serivce location, and submitting load calculations.
    Thanks!

    Is there a way that I could figure out if a service change has been made?
    KISS's Avatar
    KISS Posts: 12,510, Reputation: 839
    Uber Member
     
    #4

    Jul 21, 2009, 11:07 AM

    A load calculation tell you what you need in terms of a service. The Utility has to do their part. Higher service doesn't usually cost you that much more. Upgrade is co-ordinated with utility.

    Underground services can be a bit pricey to upgrade.

    100 A will be the minimum service put in these days. Look how your neighbor's is done to get an idea if their were upgrades.

Not your question? Ask your question View similar questions

 

Question Tools Search this Question
Search this Question:

Advanced Search

Add your answer here.


Check out some similar questions!

Relocating and upgrading my 200 amp service to 400 amp service [ 4 Answers ]

Im getting ready to upgrade and relocate my 200 amp service to a 400 amp service about 10 feet away away from original location. A new 400 amp meter base will be back to back with 2 new 200 amp panels. My question is, can I take out the guts out of my 200 amp panel and use it as a junction box to...

Upgrading electrical service in a barn [ 12 Answers ]

Hi. I'm trying to upgrade my electrical service in my barn from 120 to 240. It is 290 feet from my main service panel, and I'd like to take 50 amps out to a subpanel that's already there. I've done the calculations for voltage drop (I hope correctly) and I think what I need is #4 (copper) wire...

Upgrading to 200 amp service [ 1 Answers ]

I want to upgrade from 150 to 200 Amp service. My current panel has double breakers in ever slot except where the A/C, Dryer and Range are connected. I have wired panels before but never upgraded the service. I have studied and planned the change over the last two months but I still have a question...

Upgrading from 100amp service to 200 amp service [ 1 Answers ]

I have a 1994 model double wide home, and would like to change my 100 amp service to 200 amp service. ( I want to go to electric heat) I have a disconnect at the house after the meter and it say 200amp. Is the wiring from there to my breaker box able to handle 200 amp service, and if not how do I...

Upgrading/Relocating my service panel [ 1 Answers ]

I'm upgrading my service panel mainly because I need more breaker space, but will eventually need more juice. I'm an electrical engineer, but not a electrician, so I am fully aware of the principals, just not the code and best practices like electricians are, though I have been studying the code...


View more questions Search