Is wet-sanding required between coats? I've heard that it's not necessary, and you can spray multiply coats w/just letting it flash dry(what's this/how long)? I sprayed my first coat and it turned out excellent (perfectly smooth), but as soon as I applied my second coat, there was orange peel. If I were to wet-sand between coats will this remove the orange peel, and keep the orange peel from coming back when I apply the next coat? I was thinking of applying 3 basecoats of black, followed by 1 coat of clear w/silver pearl, 1 coat of clear, another coat with clear/silver, and finish it off with another 1 or 2 coats of clear, then buff when paint is fully dried. Any help/tips or how-many coats do you think I should apply.
Thanks,
EmJay