laser123
Feb 8, 2009, 09:47 PM
I'm about to undertake a bathroom remodel in a 1925 home that was originally remodeled in 1963.
I would like to:
1. switch current tub to claw foot model.
2. Possibley add drain under claw foot tub to allow draining of floor in the event I use as a shower.
3. Move the toilet over 9 inches to allow installation of a larger vanity.
What are the suggestions/complications and any rough rough estimate of number of plumber hours involved. ( I will have my demo man remove all old tile and floor)
Thanks
I would like to:
1. switch current tub to claw foot model.
2. Possibley add drain under claw foot tub to allow draining of floor in the event I use as a shower.
3. Move the toilet over 9 inches to allow installation of a larger vanity.
What are the suggestions/complications and any rough rough estimate of number of plumber hours involved. ( I will have my demo man remove all old tile and floor)
Thanks