Not your question?
Ask your question
View similar questions
Add your answer here.Check out some similar questions!
Connecting basement plumbing to cast iron waste stack
[ 1 Answers ]
I'm putting in a half bath and a washing machine in our basement and I'd like to like to connect it to the main stack and drain, which is all 4-inch cast iron. The sweep where the stack meets the sewer line has no clean out and appears to have some corrosion, so I'd like to replace it. I was...
Reposition P-trap, waste line to accommodate new vanity shelf
[ 3 Answers ]
Hi, It seems that this has been a common problem for many. But the problems that are posted have not exactly been identical to mine, thus I am still on a quest to find a favorable solution. I am remodeling my half bath on the first floor. The new vanity has a fixed shelf measuring about 15.5...
Connecting brass drain of a tub to pvc waste line
[ 1 Answers ]
Hi, I am plumbing a new american standard tub. The overflow/waste drain is attached and in place. My existing waste line is 1 1/2" pvc, but the brass drain seems to be someplace between 1 1/4" and 1 1/2". What is the best method to attach to the wast line (with a p-trap before the...
Replace Lead Pipe from Toilet to Hubless Waste Pipe
[ 3 Answers ]
My house is a craftsman style house from 1912 in Oakland, California. I have a big hole in a 24" horizontal lead pipe that bends at 90 degrees and connects the only toilet in the house to the hubless waste pipe. How do I go about removing the lead pipe? (What tools do I need and what type of...
Connecting second floor waste to main waste stack?
[ 3 Answers ]
I have new new modular cape that had the first floor plumbing complete, and the second floor stubbed, and want to know the right way to connect the second floor waste drain which was installed in the house, to the main waste drain. The main waste drain comes up verically from the basement floor... View more questions Search
|