Thanks,
I only have a 6" opening to try and pour or stick something between the subflooring and the shower bottom. I could cut small 2x4 blocks and force them between shower bottom and subfloor?
Search:Type: Posts; User: abean Search: Search took 0.00 seconds.
Results 1 to 2 of 2
|