    going to finish my basement...
    hello. I'm starting the infamous "basement project". For starters, the floor is not level. The house if about 45+/- years old. It's not on a huge or uncomfortable pitch, but the floor leans slightly to the floor drain.
    What I'm wondering really is where the 3 floor support posts are under the main joist the concrete raises to meet the concrete pedistal the post sits on. Should I just frame that wall with a second 2x4 underneath to compensate? And, do you understand what I'm asking because I'm a novice at this?

    :o)
  • Apr 22, 2005, 09:11 PM
    labman
    If there is going to be room for a second 2 x 4 much of the way, it might be the best way. A 2 X 4 will bend some. You could take some of the gap out be using different length studs. Go too far that way, and it will be difficult to flip the framed up wall into position. The wall won't be bearing any weight, so a few gaps will be OK. Just make sure you have plenty to nail a base board to.
  • Apr 23, 2005, 06:47 AM
    murley
    Cool. That's what I was thinking, I just didn't know. I wasn't sure if I should cut the sheetrock to follow the floor line then, too? Obviously going to want to put up some baseboard to cover things up.
  • Apr 23, 2005, 03:32 PM
    labman
    Caulk and trim are the carpenter's best friends. Get the 2 x 4's close, the dry wall might better have a little gap form the floor to keep from drawing damp, and a base board to hide everything.
  • Sep 27, 2009, 03:08 PM
    EZHangDoor

    When finishing a basement be sure to verify with your local building department if you need a building permit. Most codes require an egress window to be installed.

    Building basement walls isn't that difficult. Here are some tips for building walls.
  • Oct 5, 2009, 08:22 AM
    dhatura

    Or there is the good old "dont tell" policy. If your doing your basement I wouldn't even bother checking with the city. Not unless you're building a guest house down there. Just one suggestion for you since it seems like you got pretty much everything covered. When you install your base moulding, leave it about 1/8"+ from the floor, and then install base shoe tight to the floor. You will thank me for this later. It makes the process easier
  • Oct 8, 2009, 04:45 AM
    cyberheater

    Ezhangdoor and dhutra, you picked up a post from 2005
  • Oct 8, 2009, 03:23 PM
    EZHangDoor

    I guess your right. I didn't even look at the date... Oh well, maybe someone else can benefit by reading the old post. Better late than never!