What would a contractor charge per sq ft to paint a concrete floor with two part epoxy (7700 sq ft) would the price include materials
What would a contractor charge per sq ft to paint a concrete floor with two part epoxy (7700 sq ft) would the price include materials
There is no possible answer to this question. Get 3 quotes and go from there. If you are in downtown NYC you will pay $$$$more than Meridian MS.
All times are GMT -7. The time now is 07:35 AM. |