Last week I had a local concrete company form and pour a monolithioc slab for a garage. The ground was soft top soil and I was concerned about it being soft. It did later compact an was very hard, but then it rained and was a big soupy mess. They came on out and covered it with plastic and poured the concrete even though muddy. They stomped around in it and it was no longer level nor compact, should I be worried.