Apr 24, 2005, 04:53 PM
Hello Experts,
My son and I are doing the new DWV system for our house. I have a lot of experience in doing plumbing so I'm not a novice, but I do need to make sure I am doing the venting properly (I know the vent is just as important as the drain lines) as I haven't done anything quite this complex.
There is a main 4" drain line in the middle of the house that splits to 2 3" lines, one going to the master bath and a half bath, and the other going to the other end of the house that has 2 back-back bathrooms (mirror images of each other). The kitchen sink and island sink dump straight into the main 4" line; these 2 drain lines vary from 16" to 24" below the subfloor.
As you go upstream to the 2 bathrooms, there is a 3/3/1.5/1.5" double wye with street 45's that gets the drains from each tub/shower. The next thing the 3" line picks up is one toilet with 3" wye. The other toilet drops straight into the top of the 3" main line with a 3" tee-wye upstream from the other toilet. These 3 branches are within 3' of each other on the main 3" line. The last thing that dumps into the line is the drains for the 2 lavs. They are connected into a 2/2/1.5/1.5" double tee in the wall with the 2" drain running into the end of the 3" line; this is about 3' from the toilets. The lavs are obviously vented (which is correct, 1.5" or 2" for the lavs?) and I planned on running an 1.5" vent off of one of the tub/shower drains. Is this correct?
As you go upstream to the half bath and master bath, the first thing you come to is the toilet for the half bath. It has a 3" wye over to the toilet about 5'. The next thing that you come to (about 1' up the line) is a 3/3/1.5" tee-wye that goes to the lav in the half bath; this has 1.5" tee in the wall. Another foot up the line is a 3" tee-wye for the toilet in the master bath; it goes about 18" on the right side of the line to catch the vertical toilet pipe. The next fitting about 18" up the line is a 3/3/2 tee-wye going to the left about 2' for the corner shower. This then reduces down to 2" pipe. Next about 6-7' up the line is a 2/2/1.5" tee-wye for the drain of the corner whirlpool tub. I was planning on putting an 1.5" vent in the tub drain line. And lastly, the 2" line elbows over about 8' and up in the wall for the double vanity with a 2" tee (1.5" or 2" vent here?). Is this correct?
Also, one more thing, what is the proper way to vent an island sink (it is about 7' away from the main kitchen sink)?
I think that about takes care of it. Forgive me if I left important info out or wrote it confusingly. If something is missing that you need to know about, I'll gladly tell you what you need to know. Thanks for the help. I really appreciate it.
My son and I are doing the new DWV system for our house. I have a lot of experience in doing plumbing so I'm not a novice, but I do need to make sure I am doing the venting properly (I know the vent is just as important as the drain lines) as I haven't done anything quite this complex.
There is a main 4" drain line in the middle of the house that splits to 2 3" lines, one going to the master bath and a half bath, and the other going to the other end of the house that has 2 back-back bathrooms (mirror images of each other). The kitchen sink and island sink dump straight into the main 4" line; these 2 drain lines vary from 16" to 24" below the subfloor.
As you go upstream to the 2 bathrooms, there is a 3/3/1.5/1.5" double wye with street 45's that gets the drains from each tub/shower. The next thing the 3" line picks up is one toilet with 3" wye. The other toilet drops straight into the top of the 3" main line with a 3" tee-wye upstream from the other toilet. These 3 branches are within 3' of each other on the main 3" line. The last thing that dumps into the line is the drains for the 2 lavs. They are connected into a 2/2/1.5/1.5" double tee in the wall with the 2" drain running into the end of the 3" line; this is about 3' from the toilets. The lavs are obviously vented (which is correct, 1.5" or 2" for the lavs?) and I planned on running an 1.5" vent off of one of the tub/shower drains. Is this correct?
As you go upstream to the half bath and master bath, the first thing you come to is the toilet for the half bath. It has a 3" wye over to the toilet about 5'. The next thing that you come to (about 1' up the line) is a 3/3/1.5" tee-wye that goes to the lav in the half bath; this has 1.5" tee in the wall. Another foot up the line is a 3" tee-wye for the toilet in the master bath; it goes about 18" on the right side of the line to catch the vertical toilet pipe. The next fitting about 18" up the line is a 3/3/2 tee-wye going to the left about 2' for the corner shower. This then reduces down to 2" pipe. Next about 6-7' up the line is a 2/2/1.5" tee-wye for the drain of the corner whirlpool tub. I was planning on putting an 1.5" vent in the tub drain line. And lastly, the 2" line elbows over about 8' and up in the wall for the double vanity with a 2" tee (1.5" or 2" vent here?). Is this correct?
Also, one more thing, what is the proper way to vent an island sink (it is about 7' away from the main kitchen sink)?
I think that about takes care of it. Forgive me if I left important info out or wrote it confusingly. If something is missing that you need to know about, I'll gladly tell you what you need to know. Thanks for the help. I really appreciate it.