Stephen Wozab
Aug 30, 2014, 06:39 AM
I have a rough in for what I think is a bathtub drain in my basement.  The drain is 15.5 inches from the studs.  Some of the other questions I've seen on here suggest that there should be a tub box for the rough in located under a thin layer of concrete.  I tried breaking out the concrete with a 4 pound sledge and it does not appear that it is a thin layer of concrete.  I think I am going to have to cut the concrete to allow for the drain on the tub.  Should I just cut the concrete in the dimensions to allow for the drain and then dry fit everything?  Do I pour concrete once everything is fit?  What are some of the other considerations I should take into account?