Hi There,
I am doing rough in for the bathroom in the basement. I have cut into concrete floor and already attached 3"abs pipe to one of the drain lines coming from first floor. NOW in order to maintain a downhill slope I have to raise the toilet flange.! (about one and a half inch) above concrete floor. Shouild I use shorter sweep for connecting to flange or should I raise the floor in that space.
I am doing rough in for the bathroom in the basement. I have cut into concrete floor and already attached 3"abs pipe to one of the drain lines coming from first floor. NOW in order to maintain a downhill slope I have to raise the toilet flange.! (about one and a half inch) above concrete floor. Shouild I use shorter sweep for connecting to flange or should I raise the floor in that space.