Hello. I am just in beginning stages of finishing basement bathroom. It has been rough plumbed for toilet, sink and shower. I also have a holding tank that will have to be pumped up to house sewage line. We have a septic.
My question is about venting. There is a 2" pipe coming out of ground for sink and a 2" pipe coming up out of 12"x12" opening in foundation floor for tub. Also 4" pipe sticking up for toilet. I can see that the sink pipe feeds into the tube drain right after the trap. I cannot see where these link up with toilet drain. The all run about 15' to holding tank that has 4" pipe going into it.
Do I have a wet vent here? I have an open vent pipe above holding tank. I have already bought pump for tank... is this the only vent I need. Or do I need to also run something from the sink drain (as a wet vent). This is very confusing.
Also, I am about to start framing the bathroom and to give 15" clearance between middle of toilet drain and wall towards tub I would have to move tub drain over farther into 12" clearance between middle of toilet drain and wall towards tub I would have to move tub drain over farther into 12" hole and actually build wall with framing covering part of the hole. Seems like they could have left more room (there is plenty).
Hope this all makes sense. I appreciate any input.
My question is about venting. There is a 2" pipe coming out of ground for sink and a 2" pipe coming up out of 12"x12" opening in foundation floor for tub. Also 4" pipe sticking up for toilet. I can see that the sink pipe feeds into the tube drain right after the trap. I cannot see where these link up with toilet drain. The all run about 15' to holding tank that has 4" pipe going into it.
Do I have a wet vent here? I have an open vent pipe above holding tank. I have already bought pump for tank... is this the only vent I need. Or do I need to also run something from the sink drain (as a wet vent). This is very confusing.
Also, I am about to start framing the bathroom and to give 15" clearance between middle of toilet drain and wall towards tub I would have to move tub drain over farther into 12" clearance between middle of toilet drain and wall towards tub I would have to move tub drain over farther into 12" hole and actually build wall with framing covering part of the hole. Seems like they could have left more room (there is plenty).
Hope this all makes sense. I appreciate any input.