Brysize
Feb 1, 2005, 11:50 AM
I am a rookie or novice person.  I am good with instructions.  I have an unfinished basement.  In the basement, I have a full bath rough-in.  I am looking for a good book to use as a guide on how to finish my bathroom.  I am thinking of adding a full bath in the basement.  I need guidance in what step and the order to take to get the job done. 
 
My two sets are as follows: I have one bigger pipe and one smaller pipe. The big pipe is about 4" in diameter. The small pipe is about 2" in diameter. I am thinking the big one is for the waste or water. The smaller one is for the vent. Right?
 
I also don't mind getting a plumber to do the final connections, but I would like to do the rough-in for him. At the minimum I need to do the walls and leave him enough room to make his install. Any suggestions would be much appriecated. Thank you for your feedback. :D
My two sets are as follows: I have one bigger pipe and one smaller pipe. The big pipe is about 4" in diameter. The small pipe is about 2" in diameter. I am thinking the big one is for the waste or water. The smaller one is for the vent. Right?
I also don't mind getting a plumber to do the final connections, but I would like to do the rough-in for him. At the minimum I need to do the walls and leave him enough room to make his install. Any suggestions would be much appriecated. Thank you for your feedback. :D