John Hancock
Dec 1, 2012, 03:51 PM
I Am About To Install A T-Bar Ceiling In My Basement.. The Joist Are 2.5 Inches Above The Main Beam.. I Want To Know Do I Measure 4 Inches Down From The Joist Or 4 Inches Down From The Main Beam In Order To Put My Perimeter Track Around The Wall.. 4 Inches From The Main Beam Would Probably Bring My Ceiling A Little To Low.. Wondering If I Could Cheat A Little & Bring My Perimeter Track 4 To 4.5 Inches Below The Joist.. That Would Put The Perimeter Track 2 Inches Below The Main Beam.. Just Wondering If I Would Have any Problem Getting The Tiles In The Grid Like That With A 2 Inch Clearence Below The Beam & 4.5 Inch Everywhere Else.. Thanking U In Advance.