PatrickTownie
Aug 8, 2012, 07:13 AM
Hi Guys:
I want to move a 1/2 bath from next to my kitchen to a closet about 20 feet away.
I have clear access in the basement so putting the toilet and small sink in there will work nicely. Can I get away with no dry vent, as I will have to break open my celings to feed it across back to the venting stack. If I can, should I run the toilet and sink separate or connect the sink to the toilet drain as soon as I can under the floor. 3" PVC toilet sewage pipe and 2" PVC sink pipe. I can run both in separate floor joists across to the main 4" drain across the basement. I can also feed the 2" through a couple of floor joists to meet the 3" toilet sewage pipe.
Not sure if which idea would work best for wet venting.
Any help would be much appreciated...
I want to move a 1/2 bath from next to my kitchen to a closet about 20 feet away.
I have clear access in the basement so putting the toilet and small sink in there will work nicely. Can I get away with no dry vent, as I will have to break open my celings to feed it across back to the venting stack. If I can, should I run the toilet and sink separate or connect the sink to the toilet drain as soon as I can under the floor. 3" PVC toilet sewage pipe and 2" PVC sink pipe. I can run both in separate floor joists across to the main 4" drain across the basement. I can also feed the 2" through a couple of floor joists to meet the 3" toilet sewage pipe.
Not sure if which idea would work best for wet venting.
Any help would be much appreciated...