Musicdragon
Dec 17, 2011, 03:36 PM
Using rough lumber, the wall to my over-the-garage studio is a full 6". Since the ceiling below is already sheet-rocked,can my sub-contractor run the pipes in the wall, rather than ripping up my sheet-rock?
Thanks!
Thanks!