Hi there - I could really do with your advice.
I have a house in the caribbean that is about 60 foot long. I have just installed a new septic tank, with 4" pipe running at least 1/8th" of fall running down both sides of the house along its length. These are going to be the main soil pipes from the house to the septic tank - they join together just before the tank with a Y fitting and cleanout and enter the septic tank as one 4" pipe. All good so far!
I am installing 4 ensuite bathrooms and 1 toilet and sink on the ground floor and want to add a second floor with upto an additional 6 ensuite bathrooms.
As the 4" pipes enter the house horizontally, I plan to go vertical first in a cavity wall with Ys and 45's to create 4" drain stacks for the second floor, and then on the ground floor horizontal section to go to 3" to service the toilets, showers and sinks. The 3" dry vent would rise from the toilets up through the ceiling, (with sinks and shower T-ing into it), so on the second floor I will see my 4" vertical drain stacks and then also the 3" vertical dry vents coming up through the floor. Still all good so far.
How do I now connect my second floor toilets to the drainage and vent them? I guess I can't position my 2nd floor toilets directly above my first floor toilets as the 3" dry vent would now become a wet vent and given the number of bathrooms on the second floor (up to 6 in total), I guess I would exceed capacity. I also believe I would need to re-plan the ground floor venting so that it now joined up above the 2nd floor waste connections.
Am I right in thinking I need to go 3" horizontal off the 4" drain stack for my toilets again (as I did for the ground floor), then vent with 3" again and then T the ground floor vent and second floor vents into the 4" drain stack above any drain fittings (so I end up with a 4" dry vent coming out the roof, with the 1st floor and second floor dry vents entering it).
Will this work effectively and are there any other ways of doing this? I want to do this right first time, as I am doing this on a crazy tight budget!
Thanks
Richie
I have a house in the caribbean that is about 60 foot long. I have just installed a new septic tank, with 4" pipe running at least 1/8th" of fall running down both sides of the house along its length. These are going to be the main soil pipes from the house to the septic tank - they join together just before the tank with a Y fitting and cleanout and enter the septic tank as one 4" pipe. All good so far!
I am installing 4 ensuite bathrooms and 1 toilet and sink on the ground floor and want to add a second floor with upto an additional 6 ensuite bathrooms.
As the 4" pipes enter the house horizontally, I plan to go vertical first in a cavity wall with Ys and 45's to create 4" drain stacks for the second floor, and then on the ground floor horizontal section to go to 3" to service the toilets, showers and sinks. The 3" dry vent would rise from the toilets up through the ceiling, (with sinks and shower T-ing into it), so on the second floor I will see my 4" vertical drain stacks and then also the 3" vertical dry vents coming up through the floor. Still all good so far.
How do I now connect my second floor toilets to the drainage and vent them? I guess I can't position my 2nd floor toilets directly above my first floor toilets as the 3" dry vent would now become a wet vent and given the number of bathrooms on the second floor (up to 6 in total), I guess I would exceed capacity. I also believe I would need to re-plan the ground floor venting so that it now joined up above the 2nd floor waste connections.
Am I right in thinking I need to go 3" horizontal off the 4" drain stack for my toilets again (as I did for the ground floor), then vent with 3" again and then T the ground floor vent and second floor vents into the 4" drain stack above any drain fittings (so I end up with a 4" dry vent coming out the roof, with the 1st floor and second floor dry vents entering it).
Will this work effectively and are there any other ways of doing this? I want to do this right first time, as I am doing this on a crazy tight budget!
Thanks
Richie